10+ Years of Technical Experience 1000+ Projects Completed 50+ Accredited Laboratory Partners Technical Support in 30+ Countries
Home › Knowledge Center › TAREKS & Import › How Is TSE Review Carried Out?

How Is TSE Review Carried Out?

Document review is sometimes not enough in the TAREKS process; for certain product groups, TSE (Turkish Standards Institution) review comes into play as an additional technical assessment stage. In this article we explain when this review is required and how it works.

When Does TSE Review Come Into Play?

TSE's technical review role varies depending on the product group and relevant legislation. In general, a TSE assessment can be requested when document review is not considered sufficient to confirm the product's actual conformity, or when the relevant legislation specifically prescribes a technical institution review. This review can be thought of as an additional technical verification layer that complements TAREKS's document control stage.

How Does the Review Process Proceed?

  1. The relevant regional directorate or the TAREKS process routes the product to a TSE assessment.
  2. The required technical file, sample, or additional information is sent to TSE.
  3. TSE assesses the product's conformity with the relevant standards and technical requirements.
  4. Additional testing or documents are requested if necessary.
  5. The assessment result is reported back to the TAREKS process, and the final decision is shaped accordingly.

The Difference Between TSE Review and Laboratory Testing

TSE ReviewLaboratory Testing
FocusTechnical assessment based on documents and/or a sampleMeasurement of the product's physical/electrical characteristics
When RequestedWhen document review proves insufficientWhen conformity to a standard needs to be proven through measurement
OutcomeTechnical assessment report/opinionTest report

In some cases, TSE review may also require testing at an accredited laboratory; in that case, the process overlaps with the general approach that determines which tests are required. For information on laboratory selection and process management, see our Laboratory & Test Consultancy service.

What Can Be Done to Speed Up the Process?

  • Prepare the technical file completely, anticipating a possible TSE review.
  • Make sure a suitable sample is ready, in case one is requested.
  • Confirm in advance that the relevant standard references are current and correct.
  • Designate a technical point of contact who can respond quickly to any additional questions or requests from TSE.

Frequently Asked Questions

Is TSE review carried out for every product?

No, TSE technical review comes into play for certain product groups and in certain circumstances (for example, when document review proves insufficient or additional technical assessment is required).

Are TSE review and laboratory testing the same thing?

No, TSE review is generally a technical assessment carried out based on documents and/or a sample; in certain cases, testing at an accredited laboratory may also be additionally requested.

What happens if TSE review results negatively?

In case of a negative result, corrective action may be requested, additional documents/testing may be requested, or the product's import may not be permitted; for this reason it is important that the technical file be solid before the review.

Conclusion

TSE review is an additional technical verification layer that comes into play in the TAREKS process for certain product groups. Being prepared for this stage speeds up the flow of the process and reduces potential non-conformity risks in advance.

How Does SAFETEST Support This Process? SAFETEST assesses in advance whether your product requires TSE review, prepares your technical file to be ready for this review, and manages technical liaison throughout the process.

For more information, see our TAREKS & Import consultancy service.

Get a Free Preliminary Assessment